CX-020523: Remove PACM (Presumed Asbestos Containing Material) gaskets from piping on the Neutralization System at 723-A for Pump-001

A leak has occurred on the piping of the Neutralization System at 723-A. The piping and Pump-001 will be replaced. Gaskets at flanges are PACM (Pre…

Office of NEPA Policy and Compliance

July 10, 2019
minute read time

A leak has occurred on the piping of the Neutralization System at 723-A. The piping and Pump-001 will be replaced. Gaskets at flanges are PACM (Presumed Asbestos Containing Material) and will be removed.