CX-020334: Subtask 2.6 - Optimization of Aerosol Mitigation Technology for Postcombustion CO2 Capture

Slipstream field capture studies are planned over a 3-month period at Milton R. Young Power Station (MRY) located near Center, North Dakota. EERC p…

Office of NEPA Policy and Compliance

August 5, 2019
minute read time

Slipstream field capture studies are planned over a 3-month period at Milton R. Young Power Station (MRY) located near Center, North Dakota. EERC personnel will perform the work, with MRY oversight.