Remove and replace insulation around the following Inlet Valve CCL-04 (WO# 01701925), Valve - Header Blowdown to Sump (WO# 01708340), and around a…
Office of NEPA Policy and Compliance
March 11, 2019Remove and replace insulation around the following Inlet Valve CCL-04 (WO# 01701925), Valve - Header Blowdown to Sump (WO# 01708340), and around a Gang Valve Corridor Moisture Separator (WO# 01711113). All insulation will be presumed asbestos containing material (PACM).