Upgrading mining site to 3-phase power. Extending power from transformer/meter to a switch gear unit. Installation of a 2000A switch gear unit. Ext…
SEAPA plans to construct a new, supplementary 115kV substation with a 25MVA transformer in a previously disturbed electric utility easement in Ketc…
MTNT plans to add SCADA capabilities to the local powerplant. Specifically: Purchase a new OnLogic data storage computer as specified. Purchase 5 …
Purchase a Caterpillar Excavator 320 equipped for mulching and tree clearing, to be utilized for mulching roadsides and runway areas to create effe…
GVEA plans to take a comprehensive approach to prioritizing and hardening transmission poles in the interior of Alaska. With the use of drones, AI …
Upgrading mining site to 3-phase power. Upgrading along existing overhead lines and adding a transmission pole. Installation of a meter and transfo…
The U.S. Department of Energy (DOE) is proposing to provide funding to the Pacific Ocean Energy Trust (POET) to administer the Testing and Access for Marine Energy Research (TEAMER) program.
Collecting 20-miles across 4-lines of 2-D surface seismic data.…
BUECI plans to replace the gearbox on their existing Taurus generator which provides critical backup power for the community. …
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the Alaska Village Electric Cooperative (AVEC) for the installation …