NEPA Determinations associated with EA-1968 for projects that have occurred since completion of DOE/EA-1968 on December 11, 2014.
Office of NEPA Policy and Compliance
February 26, 2019Analyses of environmental impacts performed within the National Renewable Energy Laboratory (NREL) South Table Mountain (STM) Campus Site-Wide Environmental Assessment (DOE/EA-1968) are used as the basis (wholly or in part) for the below NEPA Determinations. These documents are for projects that have occurred since completion of DOE/EA-1968 and its associated Finding of No Significant Impact on December 11, 2014.
Please see the main environmental assessment page for additional information on DOE/EA-1968.
-
11/12/2019 - NREL-20-007 STM SERF E216 Remodel (220.61 KB)
-
05/13/2019 - NREL-19-030 DuraMAT Program (240.91 KB)
-
04/23/2019 - NREL 19-025 S&TF Lab 203 Remodel (184.24 KB)
-
11/07/18 - NREL-19-006 Mesa Top Rock Removal (175.62 KB)
-
05/03/18 - NREL-18-014 STM RSF Charging Station (158.09 KB)
-
03/12/18 - NREL-18-011 HFSF Asphalt Replacement (152.18 KB)
-
08/30/16 - NREL-16-020 Optimize Heat Recovery (122.53 KB)