Multiple Structure Replacement Flaming Gorge to Vernal No. 1 138 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region
Office of NEPA Policy and Compliance
March 29, 2012Multiple Structure Replacement Flaming Gorge to Vernal No. 1 138 Kilovolt Transmission Line
CX(s) Applied: B1.3
Date: 03/29/2012
Location(s): Utah
Offices(s): Western Area Power Administration-Rocky Mountain Region
Western Area Power Administration (Western) proposes to replace eight (8) wood H-frame structures along the Flaming Gorge-Vernal No. 1 138 kilovolt transmission line. The structures arc located on both private and Bureau of Land Management (BLM) lands in Uintah County, Utah
CX(s) Applied: B1.3
Date: 03/29/2012
Location(s): Utah
Offices(s): Western Area Power Administration-Rocky Mountain Region
Western Area Power Administration (Western) proposes to replace eight (8) wood H-frame structures along the Flaming Gorge-Vernal No. 1 138 kilovolt transmission line. The structures arc located on both private and Bureau of Land Management (BLM) lands in Uintah County, Utah