CX-008347: Categorical Exclusion Determination

West Hackberry Building 301 Air Handling Unit-1 Heating, Ventilation, and Air Conditioning Replacement CX(s) Applied: B1.4 Date: 04/16/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

April 16, 2012
Estimated Read Time   min
West Hackberry Building 301 Air Handling Unit-1 Heating, Ventilation, and Air Conditioning Replacement
CX(s) Applied: B1.4
Date: 04/16/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall provide all labor, tools, materials, equipment and supervision required to replace the West Hackberry Building 301 Air Handling Unit (AHU-1) and its associated air cooled condensing unit at the West Hackberry Strategic Petroleum Reserve site for the existing Heating, Ventilation, and Air Conditioning (HVAC) unit.