Slipstream Testing of a Membrane Carbon Dioxide Capture Process for Existing Coal-Fired Power Plants CX(s) Applied: A9, B3.6 Date: 03/28/2012 Location(s): Ohio Offices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
March 28, 2012Slipstream Testing of a Membrane Carbon Dioxide Capture Process for Existing Coal-Fired Power Plants
CX(s) Applied: A9, B3.6
Date: 03/28/2012
Location(s): Ohio
Offices(s): National Energy Technology Laboratory
Evaluate the impact of carbon dioxide enriched air on coal combustion in boiler testing. The duration of the testing will be approximately 9 months.
CX(s) Applied: A9, B3.6
Date: 03/28/2012
Location(s): Ohio
Offices(s): National Energy Technology Laboratory
Evaluate the impact of carbon dioxide enriched air on coal combustion in boiler testing. The duration of the testing will be approximately 9 months.