Commercialization of an Advanced 450 Kilowatt Wind Turbine for Distributed CX(s) Applied: A9, B3.6 Date: 03/27/2012 Location(s): Vermont Offices(s): Golden Field Office
Office of NEPA Policy and Compliance
March 27, 2012Commercialization of an Advanced 450 Kilowatt Wind Turbine for Distributed
CX(s) Applied: A9, B3.6
Date: 03/27/2012
Location(s): Vermont
Offices(s): Golden Field Office
DOE is proposing to provide federal funding to Northern Power Systems (NPS) to design, build, laboratory test, and if deemed operational, field test, a prototype gearless, 450 kilowatt wind turbine.