Colorado City-Westminster CX(s) Applied: A1, A9, A11, B1.32, B2.5, B5.1 Date: 03/28/2012 Location(s): Colorado Offices(s): Energy Efficiency and Renewable Energy
Office of NEPA Policy and Compliance
March 28, 2012Colorado City-Westminster
CX(s) Applied: A1, A9, A11, B1.32, B2.5, B5.1
Date: 03/28/2012
Location(s): Colorado
Offices(s): Energy Efficiency and Renewable Energy
Energy Efficiency and Conservation Block Grant. 1) Expand public education recycling/greening campaign, 2) hire energy and facilities project coordinator, 3) administration of Colorado Governor's Energy Office program, 4) home audits, 5) insulation rebate program, 6) furnace rebate program, 7) re-energize Main Street, 8) energy efficiency retrofits of city buildings (includes potential for replacement of heating, ventilation and air conditioning (HVAC) systems, boilers, interior and exterior lighting upgrades, installation of roof-top solar photovoltaic and solar thermal systems, and stand-alone solar powered light-emitting diode (LED) parking lot lights), 9) US 36 Commuting Solutions Funding Program, 10) bicycle master plan, 11) energy code education project, and 12) City Hall parking lot LED project.
CX(s) Applied: A1, A9, A11, B1.32, B2.5, B5.1
Date: 03/28/2012
Location(s): Colorado
Offices(s): Energy Efficiency and Renewable Energy
Energy Efficiency and Conservation Block Grant. 1) Expand public education recycling/greening campaign, 2) hire energy and facilities project coordinator, 3) administration of Colorado Governor's Energy Office program, 4) home audits, 5) insulation rebate program, 6) furnace rebate program, 7) re-energize Main Street, 8) energy efficiency retrofits of city buildings (includes potential for replacement of heating, ventilation and air conditioning (HVAC) systems, boilers, interior and exterior lighting upgrades, installation of roof-top solar photovoltaic and solar thermal systems, and stand-alone solar powered light-emitting diode (LED) parking lot lights), 9) US 36 Commuting Solutions Funding Program, 10) bicycle master plan, 11) energy code education project, and 12) City Hall parking lot LED project.