Snohomish High School Field Improvements CX(s) Applied: B4.9 Date: 03/20/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
March 20, 2012Snohomish High School Field Improvements
CX(s) Applied: B4.9
Date: 03/20/2012
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration proposes to grant the Snohomish School District’s request to install a new synthetic turf with a subsurface drainage system on an existing sports field.
CX(s) Applied: B4.9
Date: 03/20/2012
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration proposes to grant the Snohomish School District’s request to install a new synthetic turf with a subsurface drainage system on an existing sports field.