Upgrade of the Existing Septic System at the Big Eddy Substation and Maintenance Facility CX(s) Applied: B4.6 Date: 02/07/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
February 7, 2012Upgrade of the Existing Septic System at the Big Eddy Substation and Maintenance Facility
CX(s) Applied: B4.6
Date: 02/07/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration
This project will involve the installation of a new septic drain field to serve the auto shop and maintenance buildings.