Upgrade of the Existing Septic System at the Redmond Substation and Maintenance Facility CX(s) Applied: B4.6 Date: 02/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
February 8, 2012Upgrade of the Existing Septic System at the Redmond Substation and Maintenance Facility
CX(s) Applied: B4.6
Date: 02/08/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration
The project involves replacing the existing septic drain field adjacent to the maintenance building within the Redmond Substation and Maintenance Facility.