CX-007989: Categorical Exclusion Determination

Grant County Public Utility District - Columbia Substation Interconnection Project CX(s) Applied: B4.11 Date: 02/14/2012 Location(s): Washington Offices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

February 14, 2012
Estimated Read Time   min
Grant County Public Utility District - Columbia Substation Interconnection Project
CX(s) Applied: B4.11
Date: 02/14/2012
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to interconnect Grant's new 230-kilovolt transmission line into bay 7 within the BPA owned 230-kilovolt Columbia Substation.