Retention Basin Cover & Liner System Removal From Service CX(s) Applied: B1.28 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
February 7, 2012Retention Basin Cover & Liner System Removal From Service
CX(s) Applied: B1.28
Date: 02/07/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The purpose of the proposed activity is to remove the KAC retention basin (cover & liner systems) from service in order to eliminate unnecessary maintenance & operational costs. The scope of the proposed activity includes cutting holes in the basin cover/liner to facilitate rain water drainage and placing in safe energy state by isolating electrical power to the basin. Entry to the basin will be controlled.
CX(s) Applied: B1.28
Date: 02/07/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The purpose of the proposed activity is to remove the KAC retention basin (cover & liner systems) from service in order to eliminate unnecessary maintenance & operational costs. The scope of the proposed activity includes cutting holes in the basin cover/liner to facilitate rain water drainage and placing in safe energy state by isolating electrical power to the basin. Entry to the basin will be controlled.