Bayou Choctaw Building 401 Air Handling Unit-3 Heating, Ventilation and Air Conditioning Replacement CX(s) Applied: B1.4 Date: 02/01/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
February 1, 2012Bayou Choctaw Building 401 Air Handling Unit-3 Heating, Ventilation and Air Conditioning Replacement
CX(s) Applied: B1.4
Date: 02/01/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, tools, materials, equipment and supervision required to replace the Bayou Choctaw Building 401 Air Handling Unit (AHU-3) and its associated air cooled condensing unit at the Bayou Choctaw Strategic Petroleum Reserve site for the existing Heating, Ventilation, and Air Conditioning (HVAC) unit.
CX(s) Applied: B1.4
Date: 02/01/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, tools, materials, equipment and supervision required to replace the Bayou Choctaw Building 401 Air Handling Unit (AHU-3) and its associated air cooled condensing unit at the Bayou Choctaw Strategic Petroleum Reserve site for the existing Heating, Ventilation, and Air Conditioning (HVAC) unit.