Griffith Substation Transformer Addition CX(s) Applied: B4.6 Date: 11/14/2011 Location(s): Nevada Offices(s): Western Area Power Administration-Desert Southwest Region
Office of NEPA Policy and Compliance
November 14, 2011Griffith Substation Transformer Addition
CX(s) Applied: B4.6
Date: 11/14/2011
Location(s): Nevada
Offices(s): Western Area Power Administration-Desert Southwest Region
Western proposes on installing a new 230/69-kilovolt transformer, 230-kV Circuit Breaker and associated electrical control equipment within the fenced area of the Griffith Substation.