Install Additional Expanded Basin Storage Racks CX(s) Applied: B1.31 Date: 12/15/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
December 15, 2011Install Additional Expanded Basin Storage Racks
CX(s) Applied: B1.31
Date: 12/15/2011
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Additional Expanded Basin Storage racks of the current design will be installed in L-Area Disassembly Basin.
CX(s) Applied: B1.31
Date: 12/15/2011
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Additional Expanded Basin Storage racks of the current design will be installed in L-Area Disassembly Basin.