CX-018789: Bell-Trentwood Number 1 Transmission Line Structure 12/4 Relocation

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

August 30, 2018
minute read time

Due to upcoming rail line construction, the railroad requested that Bonneville Power Administration relocate one structure on the 115-kilovolt Bell-Trentwood Number 1 transmission line which crosses their right-of-way. To accommodate this, Bonneville Power Administration determined that Structure 12/4 would be removed and structure 12/5 would be replaced with taller, but otherwise similar, structure in the same location. No new access roads or equipment landings are required to perform the work.