CX-003213: Categorical Exclusion Determination

Great Plains Wind Energy Transmission Development Project - Task 1 RescopeCX(s) Applied: A9, B3.1, B5.1Date: 08/04/2010Location(s): North DakotaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office

Office of NEPA Policy and Compliance

August 4, 2010
Estimated Read Time   min
Great Plains Wind Energy Transmission Development Project - Task 1 Rescope
CX(s) Applied: A9, B3.1, B5.1
Date: 08/04/2010
Location(s): North Dakota
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

The rescoping of Task 1 now consists of the installation of one, 5 kilowatt turbine at the project location. The Endurance S-250, manufactured by Windward Engineering and marketed nationally by BTI Wind Energy, LLC, is a three bladed, upwind, horizontal-axis wind turbine with a maximum electrical output of 5.0 kilowatts at 14 meters per second hub-height wind speed.