Installation of Energy Management EquipmentCX(s) Applied: B1.4, B2.2, B5.1Date: 08/12/2010Location(s): Jenks, OklahomaOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Office of NEPA Policy and Compliance
August 12, 2010CX(s) Applied: B1.4, B2.2, B5.1
Date: 08/12/2010
Location(s): Jenks, Oklahoma
Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
The Recipient proposes to replace manually operated thermostats with a digital control system as well as replace 76 Heating, Ventilating, and Air Conditioning units with newer, more energy efficient units.