CX-003560: Categorical Exclusion Determination

Interstate 75 Green Corridor ProjectCX(s) Applied: B5.1Date: 08/25/2010Location(s): Lexington, KentuckyOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

Office of NEPA Policy and Compliance

August 25, 2010
Estimated Read Time   min

Interstate 75 Green Corridor Project
CX(s) Applied: B5.1
Date: 08/25/2010
Location(s): Lexington, Kentucky
Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory


Install retail biofuel (E85) fueling infrastructure along the Interstate 75 corridor.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD