CX-003665: Categorical Exclusion Determination

High Performance Buildings Program - Hawthorne HotelCX(s) Applied: B5.1Date: 08/31/2010Location(s): Salem, MassachusettsOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

Office of NEPA Policy and Compliance

August 31, 2010
Estimated Read Time   min
High Performance Buildings Program - Hawthorne Hotel
CX(s) Applied: B5.1
Date: 08/31/2010
Location(s): Salem, Massachusetts
Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

Retrofit hotel's existing heating, ventilation, and air conditioning system with a high-efficiency, 120-ton, closed loop geothermal system in the Hawthorne Hotel. Drilling work will occur under existing parking lot.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD