Pacific Northwest Smart Grid DemonstrationCX(s) Applied: A1, A8, A9, A11, B1.7Date: 07/13/2010Location(s): Richland, WashingtonOffice(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory
Office of NEPA Policy and Compliance
July 13, 2010CX(s) Applied: A1, A8, A9, A11, B1.7
Date: 07/13/2010
Location(s): Richland, Washington
Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory
Battelle will operate the existing Electricity Infrastructure Operations Center (EIOC), located in Richland, Washington, as the central data collection and storage point for the demonstration.