Pacific Northwest Smart Grid DemonstrationCX(s) Applied: A1, A9, A11, B1.7, B3.11, B4.4, B5.1Date: 07/19/2010Location(s): Idaho Falls IdahoOffice(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory
Office of NEPA Policy and Compliance
July 19, 2010CX(s) Applied: A1, A9, A11, B1.7, B3.11, B4.4, B5.1
Date: 07/19/2010
Location(s): Idaho Falls Idaho
Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory
Deploy a 1-2 megawatt (MW) battery system at Idaho Falls Power's North Boulevard Substation, connect system to existing electrical equipment within the substation footprint, and conduct performance tests.