CX-003728: Categorical Exclusion Determination

Improved Structure and Fabrication of Large, High-Power Kinetic Hydropower System Rotors - Year 2CX(s) Applied: A9, B3.1, B5.1Date: 09/16/2010Location(s): New YorkOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office

Office of NEPA Policy and Compliance

September 16, 2010
Estimated Read Time   min
Improved Structure and Fabrication of Large, High-Power Kinetic Hydropower System Rotors - Year 2
CX(s) Applied: A9, B3.1, B5.1
Date: 09/16/2010
Location(s): New York
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

Verdant Power will use the Department of Energy funding to design and test, both in lab and in-water, a next generation advanced waterpower technology: large, high power Kinetic Hydropower System rotors. This determination is being made for the project's Phase 2 tasks which include prototype fabrication; test stand and in-water testing at the Roosevelt Island Tidal Energy Project site; and project management activities.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD