CX-004550: Categorical Exclusion Determination

American Recovery and Reinvestment Act State Energy Program University of North Texas - Denton Phase IICX(s) Applied: B5.1Date: 11/29/2010Location(s): Denton, TexasOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office

Office of NEPA Policy and Compliance

November 29, 2010
Estimated Read Time   min
American Recovery and Reinvestment Act State Energy Program University of North Texas - Denton Phase II
CX(s) Applied: B5.1
Date: 11/29/2010
Location(s): Denton, Texas
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

The University of North Texas, Denton County, proposes to install three 100-kilowatt wind turbines (Northwind 100) within an existing water retention basin in the vicinity of athletic practice fields and a new football stadium on their campus in the town of Denton (Denton County), Texas. The turbine towers would be 121 feet tall, and with an approximate 35-foot blade length, the maximum height of the structure would be 156 feet. The proposed site is approximately 125 feet from a paved road, 1,000 feet from a single home, and 1,500 feet from the nearest residential neighborhood.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD