Decommissioning of PAR Pond FacilitiesCX(s) Applied: B1.23Date: 12/17/2010Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
December 17, 2010CX(s) Applied: B1.23
Date: 12/17/2010
Location(s): Aiken, South Carolina
Office(s): Savannah River Operations Office
The scope of decommissioning of the G-Area PAR Pond Facilities comprises 4 major facilities: 651-6G, 681-23G, 681-7G and 735-7G. The objective is to remove installed process equipment and to bring radiological and chemical contamination to acceptable levels. The facility end state for 681-23G, 681-7G, 651-6G and 735-7G is demolition to the building slab or to grade. The Simple Model Decommissioning of a clean facility will be used for 651-6G and 681-23G. The Integrated Sampling Model Decommissioning of potentially contaminated facility will be used for 681-7G and 735-7G. The activity includes some deactivation of 681-6G.