CX-017663: Building 19 Air Line Project

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

February 12, 2018
Estimated Read Time   min

To replace the existing B-19 100 pounds-per-square-inch air line with a new line from the header on the pipe bridge outside of the Building throughout to the Machine Shop.