Community Renewable Energy Deployment-Sacramento Municipal Utility District: New Hope DairyCX(s) Applied: A9, B5.1Date: 05/10/2010Location(s): New Hope Dairy, CaliforniaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Office of NEPA Policy and Compliance
May 10, 2010Community Renewable Energy Deployment-Sacramento Municipal Utility District: New Hope Dairy
CX(s) Applied: A9, B5.1
Date: 05/10/2010
Location(s): New Hope Dairy, California
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office
The proposed project would involve installation of a covered lagoon digester, 500 kilowatt GreenguardTM engine for combined heat and power, solids separator, biogas collection system, engine generation set, heal exchanger, and grid interconnection. The project would also require a new concrete drainage canal and mix tank, All facilities and equipment will be installed within the existing operating area of the dairy. The electricity generated would be sold to Sacramento Municipal Utility District. The waste heal from the engine would be captured to heat the digester.