Casa Grande-Empire Double Circuit Upgrade AmendmentCX(s) Applied: B4.13Date: 04/28/2011Location(s): Pinal County, ArizonaOffice(s): Western Area Power Administration-Desert Southwest Region
Office of NEPA Policy and Compliance
April 28, 2011Casa Grande-Empire Double Circuit Upgrade Amendment
CX(s) Applied: B4.13
Date: 04/28/2011
Location(s): Pinal County, Arizona
Office(s): Western Area Power Administration-Desert Southwest Region
Western Area Power Administration proposes to work with Salt River Project on an upgrade to a double circuit on its Casa Grande-Empire 115 kilovolt transmission line. This project involves the removal of the existing H-frame wooden structures and the installation of new steel monopole structures.
CX(s) Applied: B4.13
Date: 04/28/2011
Location(s): Pinal County, Arizona
Office(s): Western Area Power Administration-Desert Southwest Region
Western Area Power Administration proposes to work with Salt River Project on an upgrade to a double circuit on its Casa Grande-Empire 115 kilovolt transmission line. This project involves the removal of the existing H-frame wooden structures and the installation of new steel monopole structures.