CX-002585: Categorical Exclusion Determination

Westside Substation Additions (Amended)CX(s) Applied: B4.6Date: 05/25/2010Location(s): Idaho Falls, IdahoOffice(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

May 25, 2010
Estimated Read Time   min
Westside Substation Additions (Amended)
CX(s) Applied: B4.6
Date: 05/25/2010
Location(s): Idaho Falls, Idaho
Office(s): Bonneville Power Administration

An environmental clearance memorandum was completed for the project on May 5, 2008. The original document is amended to more fully describe the proposed work and electrical equipment required at the Westside Substation. Bonneville Power Administration proposes to install electrical equipment within the existing Westside Substation to support Idaho Falls Power's (IFP) continuing improvements to upgrade their system from 46-kilovolts to 161-kilovolts in response to load growth in their service territory.