CX-017619: Operations Effort Towards a 1 Megawatt Proton Beam at the Neutrinos at the Main Injector

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

January 24, 2018
Estimated Read Time   min

The purpose of this activity is to perform facility and beamline upgrades needed for the allowance of 1,000 kilowatts of beam power on target. Currently the facility can accept a maximum beam power of 700-770 kilowatts. This increase in power is needed to further the reach of the NOvA experiment.