CX-017598: Building 211-8H Roof Repair

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

December 4, 2017
Estimated Read Time   min

Subcontractor will repair perimeter at the 0- to 2-inch parapet with a 4- by 20-foot Ethylene Propylene Diene Monomer rubber patch to seal holes, seal perimeter of patch with 50 feet of 5-inch seam tape, and caulk as needed on Building 211-8H.