CX-000919: Categorical Exclusion Determination

Packwood Lake Hydroelectric ProjectCX(s) Applied: B5.1Date: 02/25/2010Location(s): WashingtonOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office

Office of NEPA Policy and Compliance

February 25, 2010
Estimated Read Time   min
Packwood Lake Hydroelectric Project
CX(s) Applied: B5.1
Date: 02/25/2010
Location(s): Washington
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

Energy Northwest will use Department of Energy American Recovery and Reinvestment Act funding for the design, manufacture, and installation of a new Pelton Wheel turbine runner and related infrastructure upgrades at the Packwood Lake Hydroelectric facility.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD