Texas-City-EulessCX(s) Applied: B1.32, B5.1Date: 03/22/2010Location(s): Euless, TexasOffice(s): Energy Efficiency and Renewable Energy
Office of NEPA Policy and Compliance
March 22, 2010Texas-City-Euless
CX(s) Applied: B1.32, B5.1
Date: 03/22/2010
Location(s): Euless, Texas
Office(s): Energy Efficiency and Renewable Energy
Energy Efficiency and Conservation Block Grant Program. Replace existing field lighting fixtures, poles, and foundations, at the Texas Star Sports Center, with a "light structure green" lighting system (General Electric Power Spot).
CX(s) Applied: B1.32, B5.1
Date: 03/22/2010
Location(s): Euless, Texas
Office(s): Energy Efficiency and Renewable Energy
Energy Efficiency and Conservation Block Grant Program. Replace existing field lighting fixtures, poles, and foundations, at the Texas Star Sports Center, with a "light structure green" lighting system (General Electric Power Spot).