Repair Bayou Choctaw Timber Pipe SupportsCX(s) Applied: B1.3Date: 02/22/2011Location(s): Bayou Choctaw, LouisianaOffice(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
February 22, 2011CX(s) Applied: B1.3
Date: 02/22/2011
Location(s): Bayou Choctaw, Louisiana
Office(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all materials, tools, equipment, pile driving hammers, mobile lifting equipment, rigging, transportation, labor, and supervision required to repair or replace the timber pipe supports and cross beams which support the aboveground steel pipelines at the Bayou Choctaw Strategic Petroleum Reserve site.