Well Installations at P-Area Reactor Groundwater Operable UnitCX(s) Applied: B3.1Date: 03/01/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Office of NEPA Policy and Compliance
March 1, 2011CX(s) Applied: B3.1
Date: 03/01/2011
Location(s): Aiken, South Carolina
Office(s): Environmental Management, Savannah River Operations Office
Scope entails the installation of 30 groundwater monitoring wells at P Area in support of the P-Area Reactor Groundwater Operable Unit. Wells will be installed via Rotosonic drilling method to various depths. Six wells are planned for installation near the 105-P, 8 wells are planned for installation within P Area, and the remaining wells are to be installed in undeveloped areas outside of P Area.