Geothermal Retrofit of Illinois National Guard State Headquarters BuildingCX(s) Applied: B3.1, A9Date: 04/01/2010Location(s): IllinoisOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office

Office of NEPA Policy and Compliance

April 1, 2010
Estimated Read Time   min
Geothermal Retrofit of Illinois National Guard State Headquarters Building
CX(s) Applied: B3.1, A9
Date: 04/01/2010
Location(s): Illinois
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

This determination is limited to Phase 1 and Phase 2; Tasks 1 and 2 (Permitting and Bidding). Subtask 1.3 consists of drilling test wells into an abandoned mine shaft with the intention of conducting feasibility testing using water within the flooded mine shaft as a heat exchange fluid. All tasks and sub tasks under Phase 1 involve feasibility studies, information-gathering and documentation activities that will be conducted at the Illinois National Guard State Headquarter Building.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD