Categorical Exclusion Determination
Office of NEPA Policy and Compliance
December 11, 2017The Bonneville Power Administration proposes to address one surface impairment that was identified on the 230-kilovolt Sedro Wooly-Bellingham Number 1 transmission line between structures 12/3 and 12/4.