Toledo City American Recovery and Reinvestment Act - Energy Efficiency and Conservation Block Grant -Act 1 Collins Park Solar Photovoltaic ProjectCX(s) Applied: B3.6, B5.1Date: 04/07/2010Location(s): Toledo, OhioOffice(s): Energy Efficiency and Renewab...
Office of NEPA Policy and Compliance
April 7, 2010CX(s) Applied: B3.6, B5.1
Date: 04/07/2010
Location(s): Toledo, Ohio
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office
Energy Efficiency and Conservation Block Grant (EECBG) fund. The Project Activity Sheet titled "Photovoltaic (PV) Electric Generation System at the Collins Park Water Treatment Plant" submitted by the City of Toledo, Ohio, involves the purchase and installation of a ground-mounted 250 kilowatt (kW) PV electric generation system at the 125-acre Collins Park Water Treatment Plant (WTP). The Collins Park WTP uses in excess of 5 megawatts (MW) of power each day, every day. This project constitutes Phase 1 of a 4-phase long-range 1 MW PV project. EECBG funds would be matched 1:1 by the City to fund the installation of Phase 1. The City is funding the design. The 250 kW PV system would be tied directly to the WTP at the High Service Pump Facility, which runs all day, every day.