Olympia-Grand Coulee Number 1 Transmission LineCX(s) Applied: B1.3Date: 03/03/2011Location(s): WashingtonOffice(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
March 3, 2011CX(s) Applied: B1.3
Date: 03/03/2011
Location(s): Washington
Office(s): Bonneville Power Administration
Access road maintenance project near structure 38/2 of the Olympia-Grand Coulee Number 1 Transmission Line. Bonneville Power Administration proposes to maintain one double-culvert creek crossing on an unnamed stream. Work would include removing woody debris that is the result of beaver activity, and installing a beaver deterrent structure to exclude the beaver(s) from the culverts.