Iowa-Tribe-Sac and Fox Tribe of the Mississippi in IowaCX(s) Applied: A9, A11, B3.1Date: 04/13/2010Location(s): IowaOffice(s): Energy Efficiency and Renewable Energy
Office of NEPA Policy and Compliance
April 13, 2010CX(s) Applied: A9, A11, B3.1
Date: 04/13/2010
Location(s): Iowa
Office(s): Energy Efficiency and Renewable Energy
Energy Efficiency and Conservation Block Grant Program. Energy Efficiency and Conservation Block Grant for: 1) Complete feasibility study: Installation of anemometer tower, collection of data for one year at a site that has been pre-qualified as a potentially viable site from the energy generation standpoint and acquisition of technical services to analyze the data to determine the expected power generation capacity at the site for the specific turbine being considered.