CX-001304: Categorical Exclusion Determination

B3 Hot and Chilled Water Pump UpgradesCX(s) Applied: B1.5Date: 03/19/2010Location(s): Morgantown, West VirginiaOffice(s): National Energy Technology Laboratory

Office of NEPA Policy and Compliance

March 19, 2010
Estimated Read Time   min

B3 Hot and Chilled Water Pump Upgrades
CX(s) Applied: B1.5
Date: 03/19/2010
Location(s): Morgantown, West Virginia
Office(s): National Energy Technology Laboratory


Install new hot/chilled water pumps and variable frequency drives to replace existing pumps tied to the B3 heating, ventilation, air conditioning system. New controls will also be added for these devices.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD