CX-001202: Categorical Exclusion Determination

Cushman North Fork Skokomish PowerhouseCX(s) Applied: A9Date: 03/21/2010Location(s): Tacoma, WashingtonOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office

Office of NEPA Policy and Compliance

March 21, 2010
Estimated Read Time   min
Cushman North Fork Skokomish Powerhouse
CX(s) Applied: A9
Date: 03/21/2010
Location(s): Tacoma, Washington
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

This project will focus on the design and construction a new North Fork Skokomish Powerhouse, which will include an integral fish collection facility and fish handling and sorting device. The new powerhouse, which will produce about 23,500 megawatts hours of energy, increasing electrical generation capacity by 14 percent, requires design, engineering and construction. A fish transport system will be included as part of the design. Which will allow federally listed salmonids and trout that are swimming upstream to be trapped, sorted, and then released in the upper river.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD