Categorical Exclusion Determination
Office of NEPA Policy and Compliance
September 7, 2017The activity includes installing a new remediation well, similar to the existing remediation wells (RWM series [e.g., RWM-1 through RWM-11]), that pumps groundwater to the M-1 Air Stripper (M-Area). Design of the recovery well is complete.