Recovery Act: City of Eagan Ice ArenaCX(s) Applied: A9, A11, B5.1Date: 03/29/2010Location(s): Eagan, MinnesotaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Office of NEPA Policy and Compliance
March 29, 2010CX(s) Applied: A9, A11, B5.1
Date: 03/29/2010
Location(s): Eagan, Minnesota
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office
The City of Eagan has completed drilling test boreholes and excavating the construction site. The city of Eagan is proposing to design and install a high efficiency central plant heat pump system that will use the circulating water/ethylene glycol mixture.