Rocky Reach - Maple Valley Access Road RepairCX(s) Applied: B1.3Date: 05/05/2011Location(s): King County, WashingtonOffice(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
May 5, 2011CX(s) Applied: B1.3
Date: 05/05/2011
Location(s): King County, Washington
Office(s): Bonneville Power Administration
Bonneville Power Administration (BPA) is proposing to build and/or repair approximately 18,000 feet of access road and right-of-way road that provides access to the Rocky Reach-Maple Valley Number 1 transmission line in King County, Washington. The work is necessary to repair damage done to access roads caused by a major flood event that occurred on November 7, 2006, and thus provide continued system stability. The project includes but is not limited to: - Reconstruction (blading, reshaping, grading, and compacting) of existing road surfaces - Hauling, placing, and shaping of aggregate and rip-rap - Constructing or reconditioning of water drainage features to include culvert replacements - Placing Geotextile Fabric - Installation of gates.