Connecticut-City-MilfordCX(s) Applied: A9, B2.5, B5.1Date: 05/10/2011Location(s): Milford, ConnecticutOffice(s): Energy Efficiency and Renewable Energy
Office of NEPA Policy and Compliance
May 10, 2011CX(s) Applied: A9, B2.5, B5.1
Date: 05/10/2011
Location(s): Milford, Connecticut
Office(s): Energy Efficiency and Renewable Energy
Energy Efficiency and Conservation Block Grant Program. 1) Expand remote system to monitor energy use of city buildings environmental systems, 2) conduct benchmarking and energy audits of municipal buildings, 3) conduct feasibility study and install 300 kilowatt hours fuel cell powered by methane gas at Wastewater Treatment Plant and conduct technical analysis and engineering plan to test viability of installing combined heat and power system at Beaver Brook Wastewater Treatment Plant, 4) install heating, ventiliation, and air conditioning equipment and controls and lighting and building envelope energy efficiency improvements in City Hall, and 5) install insulation boots on heating system valve casings.