CX-016911: Slatt-John Day Transmission Tower 3/1 Guardrail Installation

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

August 15, 2017
Estimated Read Time   min

Bonneville Power Administration proposes to replace the deteriorating wood-pole structure (including, cross arms, insulators, guy anchors, etc.) of the Hood River Coop Line; Structure 1/14. Replacement would be in-kind, having the same height and configuration as the original.